DESCRIPTION OF WORK:

  • The fire was contained within the bowling alley and entertainment area
  • Smoke and water damage however was considerable 
  • The combination demanded a complete fitout
  • Smoke and water damage to adjoining buildings also required repairing.

 

SPECIAL FEATURES:

  • Complete rebuild of a new fire rated ceiling above a new suspended ceiling.

500 Ti Rakau Drive, Botany

M2:
2000m2
Duration:
6 months
Value:
$1.8m

CLIENT VISION DELIVERED:

With a complete fit out required, Focus Construction worked closely with the client to deliver a state of the art entertainment centre, surpassing anything else in the entertainment centre market.