Staged demolition and fitout of existing office space
Major upgrade of existing timber floor
Refurbishment of common toilets requiring complete services package.
SPECIAL FEATURES:
Existing timber flooring was replaced with new Strandboard floor and nogs
Extensive joinery required
All work was carried out with minimal disruption to the tenants.
Takapuna, Auckland
M2:
700m2
Duration:
7 weeks
Value:
$685,000
CLIENT VISION DELIVERED:
Working to a very tight timeline, Focus ensured the client was able to present a complete and polished environment, making the space more desirable to preferred tenants.